form work including the props can be removed from beams only after
Answer / subhayan
depends on span for upto 6m 14 days and more than that 21days
| Is This Answer Correct ? | 4 Yes | 1 No |
I found a crack on a slab in my resi.bldg.There must be a leakage.what shall i do for preventing the leakage?
Exterior Joints,define
i want texture painting pwd data
How many mortar required for Brickwork of 1 Cu.m works??
Rate analysis of Design mix concrete M50 and M60 DMRC
standard sand use?
Which are the Steel tests ?
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
where you provide overlap on column?
what is the use of dowels rod..?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
0 Answers Civil Service, Intelinet, Marg, PMC,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)