what is the mean of opc cement and conceret grade 53 n?please
explane with detail>
Answers were Sorted based on User's Feedback
Answer / anish sharma
Opc ordinary portland cement and 53 is a conceret grade it is only cement grade eg three grade of cement 33& 43&53 ( conceret grade m10:m15 m20 m25 m30 m35 m 40 m45 m50 m55 m 60 to m100
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / suman maity
If 28 days strength is not less than 53 N/mm-sq , then it is called opc grade 53.
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / rajasekar
OPC -Ordinary Portland Cement
53 Grade - a)Comp Strength is not less than 53N/mm2 at age 28 days
b)This one is high grade cement so hydration of cement is high Curing will happen suddenly
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / balaji
grade 53 cement is used for specific works.such as
bridge,dam constructions....
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / dinesh koli
OPC means ordinary portland cement
Concrete grade 53 means compresive strength of conctete is 530 kg/cm2
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / roop kumar
opc ordinry portland cement 53 means finness of the cement
| Is This Answer Correct ? | 1 Yes | 4 No |
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
what is plum & mass concrete?
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
Which are the top apps for you civil engineering?
can stub column take the load as main column
how to find hardness of water?why it should be determined?
How and where from do we get 162 for calculating sectional weight of TMT
Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand
What is the Roll of Water Bonding under VDF road?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)