form work including the props can be removed from beams only after
Answer Posted / subhayan
depends on span for upto 6m 14 days and more than that 21days
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
what is the clear cover for shearwall?
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
how to design and calculate materail quantity for concrete speedbreaker ?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
How can explode a block?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
what is the anchorage length of reinforcement.
What is the meaning of a blue land surveyors flag?
significance of specific surface area of particles?
Is there the dry coefficient of cement is constant?
how many minimum admixtures are used in water froofing structures
The foundations are placed below ground level, to increase?
rate analysis hiring of generator 62.5 KVA
How to estabilish reinforcement Steel rolling margin for a building projects ?
What will you do if a portion of load bearing wall collapses under your supervision?