how to calculate the value of 162?
Answer Posted / prabhu
=(PI/4)*d*d*7850
=Pi/4x7850xdxd
=6165.376xdxd
=(1/6165.376) x 1000 x 1000 x dxd
=dxd/162
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
what could be the production cost of 1 cum of concrete by CP30 plant
How many cement sand ballast in cc 1:4:8 40mm
what is the hanekom repairing material after concreting work
How much cement,sand,bricks and water needed for 1square metre brick work?
which type of instrument included in plumbing work?name of instrument?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
why are you joining in this (applied post) job and your aim for this job
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How to get MEP technical,instaaltion & testing data for interview?
Which is the direction of negative angle?
Technical Question of Civil Engineering
What is M40 _ TOR - EQ and B.F.S
How many mortar required for Brickwork of 1 Cu.m works??
What are the applications of cad?