how many cement and sand required for 1m2 plastering 1:4 cm
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate brick work quantity?? Block work quantity??
1 cubicmeter liquid = how much litre
Please let me know the simplest way of Calculating mix designs for any grade.
How many number of bars used in circular columns? Explain WHY?
As a proof of my analytical skills I was asked to give an example of a real life situation that i have solved analytically ? Can anybody give me a clue what kind of examples should be a suitable answer ?
What is vertical dpc and where it is construct?
1 Answers Kanwarji Construction,
how to calculate the quantity of bricks
what is the difference between the splice & Lap length.
Reinforcement details at hinged joint
How many materials e.g bricks, cement, sand, stone required to build a house for 100 sqft
questions with answers to face an interview of an civil engineer regarding RCC buidings
0 Answers Horizon Computers, NBCC,
how amny bricks of size 240 mm X 120 mm X70 mm are required in 100 cubic meter brickwork. How much cement is required at 10 mm masonry and at 4:1 sand cement ratio and how much cubic meter of sand is required for the above work.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)