In order that work may be done:(a) Two wires are necessary(b) The circuit must have a switch(c) Coal must be burnt(d) A supply of energy is required
what is the purpose of interpose t/f in control and relay ckts?
what are the major difference between 3phase 3wire and 3phase 4wire trivector meter?
if 400kv line is connected to the load but neutral ii not be connceted then wt ll happen
On what basis no of earth pits are to be decided either for transformers or for equipment?
We have Diesel generator of 200KW. fuel consumption is always same,even connected light load or full load. Is it right?
How to calculate Busbar Thickness for Different type of HT/LT panels
How i measured Bus bars weight without wighting ?
Does voltage and current can be seperated?
How can w select the cable size for different rating load & also waht r factors affecting the during selection of cable?
11 Answers AB Inc, Bosch, BRB Cable, Lucas TVS, Trisome Technical Services,
we can conformed the vector group of the transformer. How?
How many double suspension hardware fittings are required on a double circuit transmission tower?
what is V0/V rating of cable
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)