why scott connection is done why not two phases are directly
picked at the output of 3 phase transformer??
Answer / sudipt jena
Scott connection is done to get two phase supply from 3 phase input power. If we directly pick two phase from three phase supply , then the circuit becomes unbalanced.
| Is This Answer Correct ? | 0 Yes | 0 No |
in 1-phase 230v,how in 3-phase 440v. in each phase in between 230v.
Explain the role of a car driver as one of a feedback mechanism.
what is reverse power relay brief explanation and in b/w where it is connected
How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?
two generator runnig with parallel but only one NGR on And one off Why
How to identify 3 phases of 3 phase supply irrespective of there color????
what is fuction static switch in ups and tell me use parts name and fucion
what is disadvantages of high power factor
how to size H.T & L.T Panel ?
there are 3 transformers each of 1500 kva and one transformer of 1000kva for a 11 floor building . total otgoing kw is 4066 kw. i need an extra 260 kw .is there any provision for that? what is the max kw that can be connected with these transformers?
How to size fuse? How to size MCB?
what is the unit of current
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)