asubmerged weir is one in which the water level on the down
stream side of the weir is
just at the crest level
below the crest level
above the crest level
at stamp elevation as water surface on upstream
No Answer is Posted For this Question
Be the First to Post Answer
How to decide/consider the grade of bitumen for dbm.
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
how to disign cuplock shuttering and it's matireal requirement snd any related web site
what,s the clear cover of beam,slab,column,lintel and foundation?
36 Answers Max Myanmar, Spar Geo Infra, Yashwant Construction,
What is the difference between M20 and M25 concrete?
if L*B*H = 20 then direct no of bricks =20 *500
hi i am kailash we construction start a slab load baring 40feet *9 feet *4 inch plz suggest matarials and qty
how much steel required for 1 sq.m area?
24 Answers AA Architects, L&T,
What in your past experience or education prepares you for the position for which you are applying
waht is the angle of reposae
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
Describe the advantages and disadvantages of using plastic and timber fenders?