how much steel and concrete required for 450 sft slab? tell also the method
Answer Posted / tyrin lannister
generally 1 sft consumes 4-5 kgs of iron, so 450 sft x approx 4 kgs , 450x4=1,800 kgs of iron.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What are the basic use of runners and standards of pipelines?
how to calculate the length diamond shaped striupps in column
what is cement wastage percentage in NHAI ROAD WORKS
Define What is a projection line?
what are the code used for residental building?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
How to find beam R/F cutting length
What are the different types of runners?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
what is the coefficient for running feet to cft coversion both area and price
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
how to calculate quantity of bricks in circular manhole with examples.
five benefits of using standard terminology in the measurement process
punj loyed and sapurjl palanjl
What is a hatch patterns?