What us meant by DLP & liquidated damages in civil quantity surveying
Answer Posted / sreekumar
DLP MEANS :DEFECTS LIABILITY PERIOD (Certificate)"
Normally it will count from the completion of the project up to 365 days as per the FIDIC. In between these period, contractor need to rectify all the maintenance and other damages. after the DLP the Consultant will be provided the Defects Liability Certificate. Then the contract can submit the Final Statement to the consultant/client for getting there 5% retention money.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
What are the RISKS during the project construction?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
What is the compressive strength of fly ash bricks?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
mix design procedure for 1:6 cement mortar
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
what is meant by shear center?????
What are the different methods for drawing an arc?
how i can tak Quantity of mortar in block work
how many litres of enamel paint required for 5000 sft of site??
Reinforcement details at hinged joint
How to calculate 1 brss for RCC work
Form where IS456 is adopted in 1978?
What are the phases inspections are done by local authority while construction?