Answer Posted / santosh joshi
1:1:1
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define block?
How to come 1.54 from dry to wet concrete?
What are the steps involved in the concreting process?
how do you stabilize a waterlogged area in road construction
Explain major differences between routing maintenance and major maintenance.
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
how to calculate the chair reinforcement length in slabs, footing or anywhere??
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
how to caluclate sienerge qty in construction in ap
how statics is different from dynamics
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
how to calculate the size of triangular ring in rcc column?
How to calculate plastering for elevated water storage tank
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?