Answer Posted / santosh joshi
1:1:1
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
calculate the quantity of water for 1:6 cement mortar
What is the use of array command?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
what is high type road and low type roads
Why was the empire state building made of steel?
what is education Cess.
What is the use of extruded feature in solidsworks?
how much shouid be the rate for ready mix concrete per cubic meter
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
what is Bearing Capacity,How to determine it?
How to find out kg per Sft ?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?