- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
No Answer is Posted For this Question
Be the First to Post Answer
What is vcb?
why C.T protection required for H.T.lines?
which is more danjerous high voltage or high current
If DG runing time Neutral earth connection Dissconect what will be the effect in load and equipments.
How can we increase fuel-power ratio of any DG set?
In a simple spur gear train, gears with 24, 48, 32, 72 and 96 teeth are in sequence. The gear with 24 teeth runs at 900 rpm. The speed in rpm of gear with 72 teeth is
What is the difference between isolators and electrical circuit breakers? What is bus-bar?
block diagram of 2 ups system connected in parallel mode?
Why are we not getting shock while touching a metal which is being welded?
how kva rating of transformer is calculated.
6 Answers Fluor Daniel, Siemens,
When the DG is running at the time we can connect to capacitor banK? why it is required or not
What is earth system using on the floater TN-S or TT. Iam not sure and what ICCP
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)