Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
Answer Posted / rethina kumar
generally concrete is strong in compression, weak in tension, that is reason we providing reinforcement in tension zone.
1.column is compression zone, so one day is enough to deshutter
2.slab is tension zone, so it need minimum 14 days to deshutter
Is This Answer Correct ? | 30 Yes | 0 No |
Post New Answer View All Answers
Define the various stages of the project planning process in construction.
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
What is bylayer?
What is bmc stands for in bmc software?
what is tension footing?
what is difference between fluidity and workability also how palsticizer works
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
acceptance criteria for concrete works
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
What is the general specifications of a bituminous pavement road?
Explain the difference between shear and tensile strength.
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
In case if concrete box girder bridges how is the number of cells determined?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band