Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
Answer Posted / rethina kumar
generally concrete is strong in compression, weak in tension, that is reason we providing reinforcement in tension zone.
1.column is compression zone, so one day is enough to deshutter
2.slab is tension zone, so it need minimum 14 days to deshutter
| Is This Answer Correct ? | 30 Yes | 0 No |
Post New Answer View All Answers
Why steel rods are produced only in even dimensions?
what is the tensile strength of 10swg and 8swg gabion wire?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Which code is used for tor & tmt steel bar?
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
hi guys what happens if you are absent for a supplymentry exam?
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
can i get civil engineering test papers.......?????
Gidc technical que paper
what is your role of in previous company as a construction manager
How to calculate brick work quantity?? Block work quantity??
Define What is the origin of name Railway Sleepers?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)