How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
No Answer is Posted For this Question
Be the First to Post Answer
how to calculate sand, cement quantity for plastering (1:5)? what"s the formula?
how to calculate width and thickness of columns and beams for differnt area with example
what do you calaculate PCC/GRADE 10
is it compulsory to cast columns along with beams & slabs for monolithic joints
define the authorized overlap in columns
plz tell me one brick total plaster area?
9 Answers Aparna Constructions, Aparna Enterprises, L&T,
As per ratio 1:4:7, how can we calculate the quantity of materials for 1 cum of concreate, pls derive with equation
what is the difference between ribbed steel & tor Steel ?
For 25mm thick plastering how much sand and cement is used for 1 sft
1 Answers Assurance, Design Consortium,
Manpower required for de shuttering of conccrete slab
how much cement consumption in box type waterproofing
can anybody provide me the HPCL apptitude papers?am having the test on march 2008 so plz
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)