Answer / ketan shinde
100×.04=4cu.m of wet concret
To produced 1cu.m of concrte 1.54cu.m of dry concrte required
1.54×4=6.16cu.m
6.16/1+2+4=.88 cu.m of cement reqd.
.88×1440 (densityof cement)=1267.2 kg
Or
1267.2/50kg =25.34=26 bag of cement
Is This Answer Correct ? | 31 Yes | 9 No |
Answer / sanjay chandrawanshi
hi all correct answer is
100x.04=4
4x6.5 bags cement per m3= 26 bags
26x50 kg per bag = 1300 kg cement
Is This Answer Correct ? | 14 Yes | 5 No |
Answer / pankaj tiwari
100x.04=4m3
Nominal Mix 1:2:4 Ratio 1m3 Cement Consumption =312.68kg/m3
4m3 Concrete in Cement Required =1250.72kg
Is This Answer Correct ? | 0 Yes | 2 No |
mean of NH4 pipe
WHAT IS THE MINIMUM WATER CONTENT PER ONE BAG CEMENT FOR M20 CONCRETE
Sir I am from jntuk R13 regulation...... Is there any chance to leave credits
how to consider the lap length of a bar in IS code and specify the code book name and clause& page number?
What is the neutral axis depth factor formula
WHAT ARE TYPES OF STRUCTURES
what is the relation between pitch of steel and depth of slab?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
what is meant by expansion joints in concrete structures?
Characteristics of a model project are ––
cinder filling or Brick Aggregate filling in sunken portion.which one is better
1 Answers Chenab Valley Power Projects,
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?