adspace
what is the mean of opc cement and conceret grade 53 n?please
explane with detail>
Answer Posted / roop kumar
opc ordinry portland cement 53 means finness of the cement
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
I need to constructive work in amaraj batteries
what is the 0 value in quantity surveying
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
HOw much % of premium on DSR-2013 currently
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Technical Question of Civil Engineering
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
can i get civil engineering test papers.......?????
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.