what is the mean of opc cement and conceret grade 53 n?please
explane with detail>
Answer Posted / dinesh koli
OPC means ordinary portland cement
Concrete grade 53 means compresive strength of conctete is 530 kg/cm2
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is the strength of 1:6:12 mix?
What are the advantages and disadvantages of using plastic and timber fenders?
why & what is perchatage we are using fly ash in concrete?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
What are some structures that may be subjected to fatigue?
difference between fc and fc'?
1m square 20mm plastering how much of water need curing work
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
to draw bm diagrams for portal frames under different loadings//
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
Describe Briefly The Various Methods Of Concrete Curing?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what is the meaning of degreasing of the euipment or line.
how to caluclate sienerge qty in construction in ap