Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the condition for vector group of Dyn5

Answers were Sorted based on User's Feedback



what is the condition for vector group of Dyn5..

Answer / mohit

HI,
Vector group of DYn5 is delta to star with neutral having HT
lagging with 30degree.

Is This Answer Correct ?    5 Yes 2 No

what is the condition for vector group of Dyn5..

Answer / laxmikant

The condition for vectro group Dyn 5 is

keeping delta winding at reference vector at center (12 O
clock) and rotate the vetex ie star at 5 'O" clock
position. This is Dyn5 ( 150 Deg apart from 12 'O" clock
position.

Laxmikant

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

What is corona? and what is the purpose of corona belt in substation ? why they connect these end of the buses ?

2 Answers  


show me the diagram of three phase wiring and also tell me hoe to take the readings of megger testing

2 Answers  


why we are not earthing ht cable at both the ends(sending & receiving end)?

5 Answers   Essar,


where we take earth in hill station

1 Answers  


How many earthing pits are requier to disapper the surge current of one lighting arrester.

3 Answers  


what happen if the secondry winding of the transformer is having less no of turns compare to the primery winding.

2 Answers  


what is smart&micro grid technology?under coal gassification?

0 Answers  


What are test values for an 63 KVA and 100 Kva Distribution Transformers for the following typical tests 1)Magnetic balance 2)Short circuit test 3)Open Circuit test 4)Vector group confirmation test .please give me the standard values for all the above tests.

0 Answers  


what happen when increase or decrease size of lamp,light.glass.

0 Answers  


If Three Runs of 1Cx300 Sqmm Cable between Transformer and VCB and the distance between 100mtrs. what will be total length of Cable and if cost 1500Rs per meter,what would be the total cost

1 Answers   ANITS,


What is the difference between a fuse and a breaker?

0 Answers  


where HT & LT capacitor uses ?

2 Answers   NTPC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)