Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


I have lowered a submersible pump having 100 LPM discharge &
130 Mts. Head, 15 HP rating on borewell. After lowering 108
Meters, It is taking 39 amps & blowing the fuse. Can someone
put light what is the cause behind it ?



I have lowered a submersible pump having 100 LPM discharge & 130 Mts. Head, 15 HP rating on bo..

Answer / k.prakashchandra

I think water level is high . Reduce the discharge as the motor is overloaded . Provide a valve on the delivery pipe to control the discharge

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What is steady state response?

0 Answers  


Meaning of ingrace protection for motor.for ex IPXY

0 Answers   BARC,


Ratings of power transformer,Distribution transformer.

0 Answers  


what s d difference between inverter an ups

1 Answers   Jindal,


what will happen if ac motor given dc supply?

1 Answers  


whay we used silica gel in Transformer

3 Answers  


what is the impedance voltage of transformer?

1 Answers   AVI Enterprises, MacLellan,


how can we calculate the cooper armed cable size if the protection load of main fuse is 80 ampere.

1 Answers  


sir i ve applied for hindustan petroleum and power grid india ltd..and the exams on feb 22.can you pls send model papers and tell how to prepare for those.i need to get into any of these for sure.....

0 Answers  


what is the uses of C.V.T transformer in switch yard?

4 Answers   L&T,


Practical condition in 400KV Sub station:- Breaker(open) , isolator(open), Earthing (close) at both end e.g A & B. Now Open A Stn Earthing than Open B stn Earthing (Which have a 50MVA reactor) , AND suddenly show R,Y,B phase 704KV,573KV,118KV respectively. Que is without closing of breaker how it is possible.???? My Whats app No:07621840498 for Further Discussion. Pls experts suggest.

0 Answers  


1) How to calculate battery backup for ups as well as solar with complete formula elaborately......

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)