How to calculate the condensate values of boiler?



How to calculate the condensate values of boiler?..

Answer / prathab

cement consumption in plastering work
Plastering work

cemnt sand Total
Mortar 1:6 = 1 6 7


Length = 1 m
Height = 1 m
thickness = 12 mm

Toal area = 1 sqm

Total volume = 0.012 cum

Volume of mortar = 0.001714286 cum


The voids of sand we nead 20% extra material = 0.002057143 cum

Now add 20% eetra to cover uneven surface of brick work = 0.002468571 cum

One bag cement = 0.0347 cum

2 Quantity of cement required = 0.071140387 Bag

= 3.55701935 kg SI.NO DESCRIPTION UNIT QUANTITY
1 CEMENT Kg 3.56
3 Quantity of sand required = 0.014811429 cum
2 SAND Cum 0.0148

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Mechanical Engineering Interview Questions

All Rector or Exchanger have spherical/hemispherical end Why?

2 Answers   Reliance,


What are hydraulic and pneumatic machines?

1 Answers  


What is the different between brass and bronze ?

1 Answers  


what is the advantages and dis advantages of critical speed of turbine

4 Answers   Bhel, NTPC,


What is differance between compressor and blower

3 Answers  


what's are the Unit's of RPN (Risk Priority Numnber)

2 Answers  


major purposes of of the steam drum?

1 Answers  


area under P-V diagram indiacates what?

10 Answers   APGenco, Ford,


What does a pump develops? Flow or Pressure. Give the Answer with Proper Logic.

22 Answers   Essar,


What is fuel ratio ?

1 Answers  


I am completed diploma in mechanical in 2002, i have 5year experience in materials (purchase) dept,i want to do SAP cource in MM module, i want to know can i complete SAP after diploma cource only, is it usefull to me for further Job opening.

1 Answers  


Explain the otto cycle in brief.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)