Answer / prathab
cement consumption in plastering work
Plastering work
cemnt sand Total
Mortar 1:6 = 1 6 7
Length = 1 m
Height = 1 m
thickness = 12 mm
Toal area = 1 sqm
Total volume = 0.012 cum
Volume of mortar = 0.001714286 cum
The voids of sand we nead 20% extra material = 0.002057143 cum
Now add 20% eetra to cover uneven surface of brick work = 0.002468571 cum
One bag cement = 0.0347 cum
2 Quantity of cement required = 0.071140387 Bag
= 3.55701935 kg SI.NO DESCRIPTION UNIT QUANTITY
1 CEMENT Kg 3.56
3 Quantity of sand required = 0.014811429 cum
2 SAND Cum 0.0148
| Is This Answer Correct ? | 0 Yes | 0 No |
All Rector or Exchanger have spherical/hemispherical end Why?
What are hydraulic and pneumatic machines?
What is the different between brass and bronze ?
what is the advantages and dis advantages of critical speed of turbine
What is differance between compressor and blower
what's are the Unit's of RPN (Risk Priority Numnber)
major purposes of of the steam drum?
area under P-V diagram indiacates what?
What does a pump develops? Flow or Pressure. Give the Answer with Proper Logic.
What is fuel ratio ?
I am completed diploma in mechanical in 2002, i have 5year experience in materials (purchase) dept,i want to do SAP cource in MM module, i want to know can i complete SAP after diploma cource only, is it usefull to me for further Job opening.
Explain the otto cycle in brief.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)