How to calculate the condensate values of boiler?
Answer / prathab
cement consumption in plastering work
Plastering work
cemnt sand Total
Mortar 1:6 = 1 6 7
Length = 1 m
Height = 1 m
thickness = 12 mm
Toal area = 1 sqm
Total volume = 0.012 cum
Volume of mortar = 0.001714286 cum
The voids of sand we nead 20% extra material = 0.002057143 cum
Now add 20% eetra to cover uneven surface of brick work = 0.002468571 cum
One bag cement = 0.0347 cum
2 Quantity of cement required = 0.071140387 Bag
= 3.55701935 kg SI.NO DESCRIPTION UNIT QUANTITY
1 CEMENT Kg 3.56
3 Quantity of sand required = 0.014811429 cum
2 SAND Cum 0.0148
| Is This Answer Correct ? | 0 Yes | 0 No |
What do you call the clearing of air inside cylinder after combustion?
y we are used oil in the dead weight pressure tester
whats the Formula to calculate temperature of steam at given pressure
what is cathodic protection? where it is used and when? and why?
what are the causes of small two-stroke engine wear?
why we can't use condensate pump in place of feed pump.
What is the lower part of connecting rod?
what is the pattern of written test for the post of trainee mechanical engg.
what's the difference between front and rear wheel drive?on what basis we choose the type of drive?
Why the gear drives said to be power transmitting device?While it transmitting motion only.
How can heat be applied to acrylic?
what is mean dual combustion turbocharged?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)