How to calculate the condensate values of boiler?
Answer / prathab
cement consumption in plastering work
Plastering work
cemnt sand Total
Mortar 1:6 = 1 6 7
Length = 1 m
Height = 1 m
thickness = 12 mm
Toal area = 1 sqm
Total volume = 0.012 cum
Volume of mortar = 0.001714286 cum
The voids of sand we nead 20% extra material = 0.002057143 cum
Now add 20% eetra to cover uneven surface of brick work = 0.002468571 cum
One bag cement = 0.0347 cum
2 Quantity of cement required = 0.071140387 Bag
= 3.55701935 kg SI.NO DESCRIPTION UNIT QUANTITY
1 CEMENT Kg 3.56
3 Quantity of sand required = 0.014811429 cum
2 SAND Cum 0.0148
Is This Answer Correct ? | 0 Yes | 0 No |
What is the developed on working company
What is the importance of Prandtl Number in heat transfer?. Compare the prandtl numbers of Air, water and Liquid metal. If prandtl number is more what do you understand?. Will you provide fins to enhance heat transfer when prandtl number is less?.
what is the reasson after complitation of suction stroke and started comperation stroke inlet valve open for few digrees
in regenrative cycle why to use two liquid(water&mercury) on steam genration cycle.
How can check gear pitch?
engine so2 farmula
What is ton (refrigeration)?
• Are you willing to work overtime? Nights? Weekends?
why we use kg/cm2 instead of kg/m2 as a unit of pressure. As we know kg is a MKS unit and cm is a CGS unit. So why we use combination of both(kg/cm2)while describing the pressure.
Give the purpose of nozzle in impulse turbine?
2 Answers ABC Inc, RRB, Siemens,
fuction of fun
• Have you previously successful in this position progressed to within the company you have worked with?