Answer Posted / prathab
cement consumption in plastering work
Plastering work
cemnt sand Total
Mortar 1:6 = 1 6 7
Length = 1 m
Height = 1 m
thickness = 12 mm
Toal area = 1 sqm
Total volume = 0.012 cum
Volume of mortar = 0.001714286 cum
The voids of sand we nead 20% extra material = 0.002057143 cum
Now add 20% eetra to cover uneven surface of brick work = 0.002468571 cum
One bag cement = 0.0347 cum
2 Quantity of cement required = 0.071140387 Bag
= 3.55701935 kg SI.NO DESCRIPTION UNIT QUANTITY
1 CEMENT Kg 3.56
3 Quantity of sand required = 0.014811429 cum
2 SAND Cum 0.0148
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the meaning of rheostat in maximum and minimum position?
sir,i am golng to attend BHEL supervisor trainee personal interview on 11 sept.anyone share me that how could i perform well in interview& what they would expect from me. thank you.
Why the work per kg of air flow in axial flow compressor is less compared to centrifugal compressor for same pressure ratio ?
What is diffrence between star & delta connnection in practical situation in submersible pump?
One unit of btu is how many joules?
Who built the tr alaska pipelene?
What does dynamics of machines deals with ?
What is the remedy if due exchanging, valve broke out during engine running operation?
Define emissive power [eb].
Define monochromatic emissive power. [EbĪ»]
What are the items to inspect after cylinder liner is pulled out
What was the spinning jenny?
A very strange fault i cam across today,that i never experienced not studied before, i need an answer for this. Phase to phase or line to line , L1,L2 & L3, voltages are 490VAC, but if i use line to ground , its again 490 VAC. . . whats the fault and theory behind of it?
explain the omportance of "squish" and "swirl" in ci engine
what is diameter of a suction pipe?