Answer Posted / prathab
cement consumption in plastering work
Plastering work
cemnt sand Total
Mortar 1:6 = 1 6 7
Length = 1 m
Height = 1 m
thickness = 12 mm
Toal area = 1 sqm
Total volume = 0.012 cum
Volume of mortar = 0.001714286 cum
The voids of sand we nead 20% extra material = 0.002057143 cum
Now add 20% eetra to cover uneven surface of brick work = 0.002468571 cum
One bag cement = 0.0347 cum
2 Quantity of cement required = 0.071140387 Bag
= 3.55701935 kg SI.NO DESCRIPTION UNIT QUANTITY
1 CEMENT Kg 3.56
3 Quantity of sand required = 0.014811429 cum
2 SAND Cum 0.0148
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are different types of gate valves?
How do you find ductile-brittle transition temperature of metals?
What is the indication of leaking starting valve of an engine?
1draw a convergent uniform and divergent circular pipe and draw hydraulic gradient line and total energy line.
What is general pressure ratio for axial, reciprocating and centrifugal compressors?
What are the procedures of starting of diesel engine?
What do you treat in high alkalinity of boiler water?
Dear Friends I want to previous 5-10 years technical and non tech. question paper of section engineer (mechanical)of RRB and also tell me how should I prepare for S.E. and which books will help me for technical,aptitude,resoning.plz send me at bkcs.bkcs@rediffmail.com
Is copper tube withstand under hard water say as 500 TDS.And is it cleanable by solfamric acid or by tube brushing
what is varible
Identify or enumerate the parts of stern tube
what is diameter of a suction pipe?
What is ferrite?
What is the difference between an electric motor and an electric generator?
what is the procedure getting road permit form online