How to calculate the condensate values of boiler?

Answer Posted / prathab

cement consumption in plastering work
Plastering work

cemnt sand Total
Mortar 1:6 = 1 6 7


Length = 1 m
Height = 1 m
thickness = 12 mm

Toal area = 1 sqm

Total volume = 0.012 cum

Volume of mortar = 0.001714286 cum


The voids of sand we nead 20% extra material = 0.002057143 cum

Now add 20% eetra to cover uneven surface of brick work = 0.002468571 cum

One bag cement = 0.0347 cum

2 Quantity of cement required = 0.071140387 Bag

= 3.55701935 kg SI.NO DESCRIPTION UNIT QUANTITY
1 CEMENT Kg 3.56
3 Quantity of sand required = 0.014811429 cum
2 SAND Cum 0.0148

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are different types of gate valves?

685


How do you find ductile-brittle transition temperature of metals?

569


What is the indication of leaking starting valve of an engine?

1658


1draw a convergent uniform and divergent circular pipe and draw hydraulic gradient line and total energy line.

1525


What is general pressure ratio for axial, reciprocating and centrifugal compressors?

1385






What are the procedures of starting of diesel engine?

1593


What do you treat in high alkalinity of boiler water?

1422


Dear Friends I want to previous 5-10 years technical and non tech. question paper of section engineer (mechanical)of RRB and also tell me how should I prepare for S.E. and which books will help me for technical,aptitude,resoning.plz send me at bkcs.bkcs@rediffmail.com

1352


Is copper tube withstand under hard water say as 500 TDS.And is it cleanable by solfamric acid or by tube brushing

1814


what is varible

1672


Identify or enumerate the parts of stern tube

1427


what is diameter of a suction pipe?

1553


What is ferrite?

835


What is the difference between an electric motor and an electric generator?

670


what is the procedure getting road permit form online

1191