difference between specification and method of statement

Answers were Sorted based on User's Feedback



difference between specification and method of statement..

Answer / john

Hello my name in John I'm an architectural engineer with more than 3 years of experience in engineering field.. I hope this will help.

specification making depends on what specifications your going to specify.

like for example ill make specifications regarding architectural work, you will just usually specify your materials and scope of work.. see sample below.

1. Doors - should be painted green and have a dimension of 2100mm x 900mm they should be 50mm THK. and have stainless steel handles. Door frames should be painted green to match with the door leaf.

2. Windows - should be 900x1200mm wide, the window frames should be tubular and powder coated and to be painted green to match with the doors.

3. Ceiling - height should be 2400mm from the floor finish, the ceiling should be 6mm thk. fiber cement board. to be painted green to match with the doors.

4. floor – will be covered with 600x600x6mm thk. Floor tiles, color to match with door.

etc....

While in method statement you should specify the instruction or the step by step procedure in construction..

e.g. Lets say you'll make an architectural method statement.. see sample below..

step 1. Before any architectural works can begin the site engineer will make sure all structural works should be completed first..
step 2. after the structural is finished install all supporting systems required by MEP. Structural engineer to supervise site installation..
step 3. Create all necessary wall opening and clean them with (whatever the subcontractors proposal) so that dust other vermin cant compromise the integrity of the openings.
step 4. Install all doors and windows as per the suppliers specifications. (usually attachment of catalogue is inserted).
Step 5. Install all ceiling and necessary supports required make sure that the connections are complying with building codes etc…
Step6. Before installing floors make sure that the floor have the minimum amount of dust/vermin then apply a water proofing paint all over the wet area after provide a 20mm thk. Setting concrete, and layout the tiles accordingly.
Step 7. Install blah blah blah blahh......... with supervision of site engineer blah blah blah…

I hope this samples will help you understand better..

Please note that these are just samples. Writing specifications and method statements are much more complicated than what I have shown above, these are just simplified versions, to be able to write them properly you need to have a lot of site (construction) experiences + knowledge in handling and installation of materials..

Is This Answer Correct ?    12 Yes 2 No

difference between specification and method of statement..

Answer / lucy

Specification is the minimum requirement of the project.

e.g.
1. All corridors should not be less than 1.2 meters in width.
2. All ceiling height should be not less than 2.75 meters in height.
3. There should be 1 dedicated parking space for every 10 building occupant.
4. If the corridor is more than 100 meters, there should be a minimum of 3 exit stairs.
5. If a single room have more than 50 occupants, it should have a minimum of 2 exit doors.
6. All internal rooms shall be finish painted.
7. The building Façade should be covered with aluminum cladding.
8. All rooms should have a wooden door.

For specifications, always remember the word : "minimum requirement"

Method statement is the installation method.

You need to describe how are you going to install different items.

e.g.
1. how will you install doors?
2. how will you install windows?
3. how will you install furnitures?
4. how will you install toilet fixtures?
5. how will you install lights?
6. how will you install the foundations?
7. how will you install the tiles?
8. how will you paint the walls?

Is This Answer Correct ?    2 Yes 0 No

difference between specification and method of statement..

Answer / devendra

should be mi9nimum20mm between the brick to brick.

Is This Answer Correct ?    3 Yes 13 No

Post New Answer

More Civil Engineering Interview Questions

Hai, I have applied for APPSC AEE (I&CAD) post.I need previous AEE papers of civil engineering.I hope u will kindly consider this and send.

1 Answers  


silt maximum in sand.

11 Answers   DLF,


What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?

3 Answers   Atul, AVR, Pioneer,


How much percent of steel use in concrete members etc.slab,beam,lintal,colmn,raft fondation according to concrete volume? Kindly reply me I am in dbout plz

3 Answers  


the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none

0 Answers  






what is the concrete grade for 1034.13N/mmsq

2 Answers  


Give open excavation details of Building.

2 Answers  


rate analysis for shuttering 1:6

2 Answers  


Define mirror?

0 Answers  


How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.

0 Answers   JKC, L&T,


What are the common ways of demolition?

0 Answers  


C40/50 of concrete strength is saying that 40Mpa(by using cylinder specimen) and 50Map (by using cubic specimen), but this concrete strength is Characteristic concrete strength or target mean concrete strength?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)