difference between specification and method of statement

Answer Posted / lucy

Specification is the minimum requirement of the project.

e.g.
1. All corridors should not be less than 1.2 meters in width.
2. All ceiling height should be not less than 2.75 meters in height.
3. There should be 1 dedicated parking space for every 10 building occupant.
4. If the corridor is more than 100 meters, there should be a minimum of 3 exit stairs.
5. If a single room have more than 50 occupants, it should have a minimum of 2 exit doors.
6. All internal rooms shall be finish painted.
7. The building Façade should be covered with aluminum cladding.
8. All rooms should have a wooden door.

For specifications, always remember the word : "minimum requirement"

Method statement is the installation method.

You need to describe how are you going to install different items.

e.g.
1. how will you install doors?
2. how will you install windows?
3. how will you install furnitures?
4. how will you install toilet fixtures?
5. how will you install lights?
6. how will you install the foundations?
7. how will you install the tiles?
8. how will you paint the walls?

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do you convert wind speed into force?

730


What is the use of water table & Kreb stone for drain

1367


How many % we consider for lap for reinforcement for estimates

1366


how many spacers we need for 1 ton reinforcement? aprox.

4916


What is Heavy Concrete & Normal Concrete

2235






Are cruise ships built for the transatlantic run?

756


What is labor and material payment bond?

631


how many kg of 20mm, 10mm, dust available in one ton stone boulder

1424


in the construction of residential building what type of tank are used?where?why & what is its purpose?

1905


how find the cut length of tringular ring and any formula find out the quantity of circular brick work

5678


how many digree of freedom in four bar chain

1917


Why concrete barriers have curved surface profiles?

796


how many shuttering material required for 1000 sq.m built up area.

1873


What are the steps involved in the concreting process?

866


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2612