Hi..
I am a BE GRaduate in E&E. I have 8.5 Experience in
Tendering & Estimation field. I have done SAP SD course few
years back. But due to some reason i failed to get job in
that field and continued my own field. Now I am thinking of
changing into SAP seriously. How should i go ahead???
No Answer is Posted For this Question
Be the First to Post Answer
What is full form of G.O.D in 11kv distribution?
10 Answers GOD, MSEB, Shyam Indus Power, STL,
what is total power generation in tamilnadu What are the methods used powerfactor improved? which place DC transmission line usde?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING) I O (current operating)?
what is the effect of un-synchronized power.
what will happen when a bulb s connected btwn two phases of a three phase delta connected source?
if one of the phase is failed to 3 phase IM. what will happen?
Can anyone explain me about the RLC based Impulse high voltage generator and how to and operation of Series resonant High voltage reactor...?
why some harmonics are disturbing while the others not
sometime battery charged and then automatically charged when rectifier ON conition, is there any chances please clarify the same.
WHY WE ARE DOING THE EARTHING IN A SYSTEM. SOME PEOPLE ARE TELLING FOR PROTECTION. WHAT PROTECTION GIVE ME THE CORRECT ANSWER.
what is JE exam?
DESCRIBE THE CONSTRUCTION ANDOPERATION OF BELT CONVEYORS AND SCR CONVEYORS , DRAW NEAT SKETCHES
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)