Hi..
I am a BE GRaduate in E&E. I have 8.5 Experience in
Tendering & Estimation field. I have done SAP SD course few
years back. But due to some reason i failed to get job in
that field and continued my own field. Now I am thinking of
changing into SAP seriously. How should i go ahead???
No Answer is Posted For this Question
Be the First to Post Answer
How to increase the backup of three phase ups?
give me a clear defination of inductance,and how can u calculate inductance of a motor
What type of changeover switch needed to run a load of five 1.5 tonn ACs.
As i want some model question paper in basic computer science and history please send me immediately sir
0 Answers TNPSC Tamil Nadu Public Service Commission,
Why 30kw 40 hp 4 pole 3ph induction motor over heated?any steps on reduction in heat?
Is it necessary to place tap changer in secondary winding or we can use on both sides?
what are smoke detectors ?
4 Answers Indian Military Services,
What is meant by analogous system?
Hello sir This is prakash from bangalore i have a doubt why we have to maintain DG power factor in the range 0.78 to 0.8 Perhaps i f it is increased means what will happen in DG
What is difference between Earthing, Ground and Neutral?
1 Answers ABB, ABC, Indo Asian,
what is the purpose of vector group in a transformer ? if 2 tranaformers r connected in parallel the vector group is same or not? for parallel operation 2 transformers of different manufacturers maintain same vector group or not?
How can we checked Killo Watts of Motor & Alternator?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)