Hi..
I am a BE GRaduate in E&E. I have 8.5 Experience in
Tendering & Estimation field. I have done SAP SD course few
years back. But due to some reason i failed to get job in
that field and continued my own field. Now I am thinking of
changing into SAP seriously. How should i go ahead???
No Answer is Posted For this Question
Be the First to Post Answer
why voltage rating not mention at HPSV or HPMV lamps?
why the vector group of excitation transformer is YD5(150 deg)how is this factor decided.
why does the magnetic balance tests at transformer?
DERIVE AN EXPREION FOR MAXIMUM POER TRANSMISSION, WHAT ARE ITS APPLICATIONS.
what will be happened when a single phase motor is supplied by the dc supply
in a large three phase induction motors usually the value of full load slip is
What causal system?
How to calculate the ups battery back up? give the formula.
15 Answers Cushman Wakefield, Ethio Telecom, Exide, MacLellan, Morgan Stanley, TATA,
In Swinburne's Test on D.C.machines, why the efficiency is more when the machine runs as generator than when it runs as motor???
6 Answers College School Exams Tests, GE, MVR, Practical Viva Questions,
what methods are used to improve power factor?
what is the voltage rating of chiller unit sensors
What is CBCT ? Why & Where it is used?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)