Hi..
I am a BE GRaduate in E&E. I have 8.5 Experience in
Tendering & Estimation field. I have done SAP SD course few
years back. But due to some reason i failed to get job in
that field and continued my own field. Now I am thinking of
changing into SAP seriously. How should i go ahead???
No Answer is Posted For this Question
Be the First to Post Answer
Can the efficiency of transformer be measured with the help of wattmeter readings taken at primary and secondary side? Support the answer.
what is meant by motor protection relay & its working principle ?k
What are the advantages of a three-phase system over a single-phase system?
how we check vector group dyn7
what is v/f control in VFD?
What is transmittance?
Why hydropower is called renewable source of energy?
Why in power plant projects we see DOL starting method used for motors upto 160 kW instead of star delta method
how does an encoder work???
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
what is the purpose of using semiconductors in HT cables
what modulation is used in landline telephone signals?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)