Hi..
I am a BE GRaduate in E&E. I have 8.5 Experience in
Tendering & Estimation field. I have done SAP SD course few
years back. But due to some reason i failed to get job in
that field and continued my own field. Now I am thinking of
changing into SAP seriously. How should i go ahead???
No Answer is Posted For this Question
Be the First to Post Answer
why do we need to use 3c+3e cable, normally i select only 3c+e cable and i think it is enough. pls explain the usefull of 3e cable ( in this project the earthing system is well done)
Instead of single phase(220), if apply Phase to phase supply (eg: for lighting fixture). what will be the power formula? what will be the volt and current value? please explain me with some example.
in the directional overcurrent and earthfault protection,normally we are setting the angle 45 deg lead for phase fault overcurrent and -45 deg lead for earthfault fro forward direction.but both the fault are operating on the same angle region only.why?how the relay will response?
what is the relation between currebt & voltage.
I want the details about BHEL company examination.Can anyone able to help me please.
can i connect the two phases of scott connected transformer,if not why?
Why are lt windings placed near the core?
How many types of colling system it trformers?
how to store the thunder power?
If a Power Transformer Fails and the transformer manufacturer suggest that "Do all electrical test on the transformer?". What are the test to be conducted in this condition?
How to calculate rated currennt Of Mcb for 2hp motor...
when voltage increases current decreases & vice versa why it is so?