Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How many Sqm can laid Vitrified tiles
for flooring per day per masan?

Answer Posted / guest

15 sqm

Is This Answer Correct ?    12 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?

1659


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

2050


How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy

1974


How much quantity of cement,sand,stone used to build 1 cum of cc road??

1765


what is pile and deam foundation

2275


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2810


How much is the cover for slab?

1213


What are segregation and bleeding?

1131


Curing time for 1)R.C.C slab 2)B.W 3)Plastering

2023


what is the water-cement ratio of mix design while 30mpa in 7 days?

3005


what else we can add rather than admixture in concrete to reduce the cement quantity?

6100


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2793


in the earthquqke the profile of water on dam is parabolic or not

1906


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1590


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2523