how we can calculate the quantity of sand & cement & also
Aggregate so give me to this answer for a slab
Length is : 25' /3.28 = 7.62 Mtr
Width is : 30' /3.28 = 9.14 Mtr
Depth is : 0.6"/3.28 = 0.15 2Mtr
Answer Posted / khadar babu
TOTAL VOLUME:
7.62*9.14*.15=10.44cum
(M15 concrete)
cement required= 10.44*6.48=67.7bags=3384.84Kgs
Sand required= 10.44*0.434=4.54cum
Aggregates required= 10.44*0.868=9.06cum
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
How to find the cuplock pipe qty in staging for Minor bridge?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
how to stop beam concrete between column
What is proportion of PCC Grade G?
How much cement and water required for cement selery????
Define What is an ice dam sock?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
which has high compressive strength between hollow block and brick masonry?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
what are the Task work of different labour.?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
What is change order request?
five requirements of infill panels for walls?