Are you ready to relocate with your immediate family to United States as a new
employee?
No Answer is Posted For this Question
Be the First to Post Answer
how much quantity of paint is required for 1 square meter wall for single and double coat..?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
0 Answers Talib and Shamsi Constructions,
HOW TO CALCULATE THE CEMENT & SAND REQUIRED FOR 1SQM BLOCKWORK OF 200MM THICK?
please i wont to know the full meaning of P V C
Explain what is progress payment?
Why the finite element method is lower bound solution?
how to calculate cement coefficient for 20mm thick vitrified tiles flooring with cm 1:4 with explaination
function of stirrup in rcc beam & column?
2 Answers KMDA-Kolkata Metropolitan Development Authority, TK Group,
What is the finess modulus of sand?
In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
I got a concrete base to do 2200 x 2200 x 150 mm can you tell me how to calculate the quantity of cement to use
1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is the Brick Size ? 1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non Modular Brick. what is the Brick Size ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)