WHAT IS THE DIFFERENCE BETWEEN UNDERVOLTAGE COIL, CLOSING COIL
AND SHUNT TRIP COIL OF AN ACB?
Answers were Sorted based on User's Feedback
Answer / karna
Under voltage coil means it will energized when supply
available, closing coil means it will operate when we are
giving closing command at that time it will operate , shunt
trip means it will operate when we are giving trip command
manually or through fault. CLOSING COIL OPERATE MEANS WE
WILL GET OUTPUT SUPPLY FROM THE ACB TERMINALS , SHUNT TRIP
COIL OPERATE MEANS IT WILL DISCONNECT THE OUTPUT SUPPLY OF
THE ACB TERMINALS. IF UV COIL USED IN ACB MEANS WITHOUT
INCOMING SUPPLY WE CAN'T CLOSE THE ACB.
| Is This Answer Correct ? | 59 Yes | 4 No |
Answer / nirmalraj
cc used for closing the breaker contact, tc used for trip/open
the breaker contact and uv coil used for spring charge
interlock. if no supply manual spring charge is possible,
supply is present manual spring charge is not possible
| Is This Answer Correct ? | 12 Yes | 8 No |
what is practical efficiency of power transformer..?
When generator connected, the circuit ELCB exploded. What is the reson?
why tube light flicks??
1.Why we use choke?If we use for high starting voltage then different type choke gives different voltage. Is it correct?
How to choose primany and secondary side MCB
what is mean by unity power factor?why are u calling Resistivity load also unity power factor?
can any one help me out by posting something related to rvnl interview for site engineer electrical.? what is the procedure? what kinda question they ask us? how long the interview goes? and any tips? and any thing you want to share?
How do you calculate of power factor, if it is lagging or leading for unit(1).
How can we calculate the efficiency of a Running (On-Load) Motor ? What parameters are required and what is the method ?
What is meant by inverse definite mean time (IDMT)& definitemean time (DMT)?
if we have to design a small transformer of rating 1 kva or 1 mva , how can we design it?
What is the recommended voltage gap between Live and Earth and ,Earth and Neutral.If these are exceded what is the solution.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)