What are your future hopes for this job?
No Answer is Posted For this Question
Be the First to Post Answer
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
1)What's are the diff. types of column based on loading? 2)Is there any difference bitween Development length & Anchorage Length? 3) What is the basic diff. between one way & two way slab? 4) Where should use OPC & where should PPC?
how much of the strength comes from post-production curing
Why the statue of liberty is made of copper?
what is the calculation of raw material for 0.35cum of m-15
which of the following scale is largest one 1cm=50m and 1cm=50km
what are the duties of Site Engineer in work site?
0 Answers Amarprakash Developers,
What is critical path method (c.p.m)?
whaat is blister in box girder bridge and what is its function..
how many digree of freedom in four bar chain
Why we provide hair pin for shed
what"s the sort of beams?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)