HOW TO PARKING SPACE HS CALCULATED IN MULTISTORY BUILDING?
how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)
how meny typs of renging rod?
I had a plot of say 5000 sq.ft. and soil in the plot is normal soil. Now I had to work upon the tender quantities to prepare a preliminary budget within a day. Is there any thumb rule or assumptions to calculate the quantities which can differ upto 15% +/-?
what radial pressure, the NP2 class rcc pipe can sustain?
how much bags of cement will be in 1 cmt of having the ratio 1:3:6
what"s the purpose of dry lean concrete(DLC)and where it"ll be use it?
whether earth to the height of 80cm could be filled in the basement inm place of jamuna sand
what is pile foundation?
How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
what is silica fumes or micro silica? and whr is it used? wat r its advantages?
what is the difference between mortar and concrete???
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)