If a slab concrete is placed with M-20 grade concrete,
actually it has to be placed with M-30. what are the
rectifications / measures to be taken after concreting is done.
No Answer is Posted For this Question
Be the First to Post Answer
how can we calculate the cutting length of 10,12,16,20 and so on iron bars for 45 digree and 90 digree bents plz tell me if there is any formula or tabel to find it
14 Answers Anukampa Group, AZ Engineering, L&T, Navayuga,
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
What is meant by cartesian coordinate system?
How to calculate the wall thickness of building?
sir my site not availabele 12mm steel now if i use 10 mm how many spacing require for slab design slab thk 200mm footing, column,raft,wall how can calculate give me formula
what is the shuttering normal clear cover for footings, walls, beams & columnms
What isthe formula for square
1 Answers Panchayati Raj Department,
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
Can anyone tell me the thumb rule for calculating structural steel quantity?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
what is the advantage of electronic theodolite over transit theodolite?
What do mean by freeway ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)