what is the density of fine sand grade-2




Answers were Sorted based on User's Feedback



what is the density of fine sand grade-2..

Answer / ashishthakur

Fine sand density depends upon weight of concrete .

Is This Answer Correct ?    0 Yes 0 No

what is the density of fine sand grade-2..

Answer / umar iqbal

The density of fine sand is 1800 kg/cum

Is This Answer Correct ?    0 Yes 1 No

what is the density of fine sand grade-2..

Answer / sjtbehera

1750kg/cum

Is This Answer Correct ?    1 Yes 4 No



Post New Answer



More Civil Engineering Interview Questions

what's the formula for calculate pcc for matt(45mm aggregate)?

0 Answers   L&T,


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

0 Answers  


sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].

0 Answers  


How to calculate the rating of airconditioner required in any area,how to calculate the cfm required for any exhaust unit or air washer unit.

6 Answers   John Crane, Changotra Oil Furnace, Dalkia,


What is the life of anaerobic Digester if it is used for municipal solid waste digetion.

0 Answers  






how do measure the safe bearing capacity of soil? what is the compresive strength for concret?(max.&min.)

1 Answers  


shuttering consumption per square feet in multi storeyed building?

6 Answers   L&T,


how to calculate the weight of 6mm dia rod

7 Answers   Bharat Construction, Sripathi Construction,


in moon night and stars r shining with moon n u stand n lloking towards sky if u have no copass, and no any other civil lab equipment, then how u point out the North direction for serveying??

2 Answers  


How many Steel used in 1 cum tower foundation

0 Answers   STCS,


1 cft have 13.5 No of Bricks, can someone help me to answer me for it's mathematically proof?

2 Answers  


providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.

1 Answers  






Categories
  • Civil Engineering Interview Questions Civil Engineering (4638)
  • Mechanical Engineering Interview Questions Mechanical Engineering (3701)
  • Electrical Engineering Interview Questions Electrical Engineering (15776)
  • Electronics Communications Interview Questions Electronics Communications (2637)
  • Chemical Engineering Interview Questions Chemical Engineering (762)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (79)
  • Bio Engineering Interview Questions Bio Engineering (30)
  • Metallurgy Interview Questions Metallurgy (95)
  • Industrial Engineering Interview Questions Industrial Engineering (199)
  • Instrumentation Interview Questions Instrumentation (2879)
  • Automobile Engineering Interview Questions Automobile Engineering (171)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (41)
  • Marine Engineering Interview Questions Marine Engineering (62)
  • Power Plant Engineering Interview Questions Power Plant Engineering (170)
  • Engineering AllOther Interview Questions Engineering AllOther (1334)