Answer Posted / sjtbehera
1750kg/cum
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
I need old MMUP exam question and answer for Civil engineering
indian standard split spoon sampler
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
how to design and calculate materail quantity for concrete speedbreaker ?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
why we are using stub column..? is it possible to construct steel stub column..?
how to calculate the weight of concrete
What is binding spacing of the rebars at lapping zones.
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
Consumption of Binding wire for fixing of cover block in vertical surface
how can we calculate steel value, depending on load
How many feet are in 4 square yards?