Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


HOW TO CALICULATE THE LEAD ACID BATTERY AH AND HOW TO FIND
THE 1.2KVA UPS BACKUP @ 1000WATTS LOAD?

Answers were Sorted based on User's Feedback



HOW TO CALICULATE THE LEAD ACID BATTERY AH AND HOW TO FIND THE 1.2KVA UPS BACKUP @ 1000WATTS LOAD?..

Answer / jagannathan.i

AH CALCULATION= KVA*OUTPUT POWER FACTOR*NO OF HOURS BACK
UP/DC LOW VOLTAGE* INVERTER EFFICIENCY*BATTERY UTILIZATION
FACTOR

BACKUP TIME= (BATTERY AH*BATTERY UTILIZATION FACTOR/DC
CURRENT)*60

Is This Answer Correct ?    0 Yes 0 No

HOW TO CALICULATE THE LEAD ACID BATTERY AH AND HOW TO FIND THE 1.2KVA UPS BACKUP @ 1000WATTS LOAD?..

Answer / k.k dash

back up time calculation formula is=volts*no of battery*ah*60*0.7/va

answer will be in minute

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what the Microsoft .NET framework is?

0 Answers  


Why is it that polarization index type test is required for MV and HV motors and not for LV motors?

3 Answers   La-Gajjar Machineries, Qatar Airlines,


what is neutral grounding resistor?

3 Answers  


how to calculate the capacity of CT operated LT trivector meters on a particular distribution transformer.

1 Answers  


why ac wave is sinusoidal not square or triangular wave what will be reason

1 Answers   ACPL,


how to maintain frenquncy with syncronising sub-station for distribution

0 Answers   Suzlon,


When a square wave is applied to primary of a transformer then what will be output wave form of secondary ?

0 Answers  


what is the purpose of fuse?

7 Answers  


railway exam in asst loco pilot old test paper

25 Answers   Indian Railways, Loco Pilot, RRB, Southern Railways, TATA, Vimal,


in ac system the current wave form becomes zero for every half cycle then how can we get continuous supply can any one answer to this plsss

2 Answers  


Can you tell me more about pu systems (per unit systems )calculation in large power systems? how to get the base for voltage and power in generator, transformator and transmission lines?

0 Answers  


An AC Motor to give DC supply what happen the motor.whats the problem are create.

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)