HOW we can calculate the quantity of sand and cement for 1:4
plastering with a thickness of 12 mm..total area need to be
plaster is 985 sqm
Answers were Sorted based on User's Feedback
Answer / ashish
Area to be covered 985 sqm
thickness = 12mm
total cubic meter of work to be done = 985*.012 = 11.82 cum
cement sand ratio = 1:4
Cement to be consumed i Volume = 11.82*1/5 = 2.364 cum
Weight of Cement used = 2.364 * 1440 (density of cement) = 3404kg
no of bags used = 3404/50 = 68 bags (approx)
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / eakub.molla
Total area=985m2
thickness of plaster=12mm=.012m
wet volume of plaster morter=985*.012=11.82m3
dry volume of morter=11.82*1.5=17.73m3
volume of cement=17.73/5=3.546m3
volume of sand=14.184m3
cement bag=3.54/.03542 bags
=100 bags.
| Is This Answer Correct ? | 2 Yes | 0 No |
ACTUALLY I THINK
1 CUM = 35.315 CFT
12mm = .5"/ .039 feet /.012 M
so. 12 mm thick plastering = 1/ 0.012 = 83.33 Sqm
for 1 Cum cement required is in 1:4
1/4*1440 = 288 Kgs.
so, for 83.33 Sqm we need 288 kgs of cement & 288*4 = 1,152
Kgs. of sand multiply the amount with 985 & divide it by 83.33
3,404 Kgs. of Cement = 68 Bags.
| Is This Answer Correct ? | 1 Yes | 0 No |
brother in your answer plz clearly define this step
10598.6*0.5=5299.3cft
1/5*1440=288 kg\
and why cement quantity is equal to sand quantity.?
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / karthikeyan
1" = 25.4mm so,
12mm = 0.5"
total area = 985 sqm
1 sqm = 10.76 sqft
985 sqm = 10598.6 sqm
10598.6*0.5 = 5299.3 cuft(149.97 cum)
for 1 cum (1:4)1/5*1440 = 288 kg so
149.97*288 = 43191.36 kg
50 kg = 1 bag, so
863 bag cement is required
1 m^3 cement = 1 m^3 sand s0 863kg sand is
required
| Is This Answer Correct ? | 0 Yes | 5 No |
Define Who designed the city of Washington DC?
how do we calculate quantity of gypsum for 1m3? 1m3 = ?kg
Whta is the proportion of M30
Which ratio use for cement selery???
How to plan a project
0 Answers Ahluwalia Contracts, SDS,
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
how to workable concrete cube test M-25 design mix
what is main diffrence between vitrified and cremic tile????
2 Answers Colliers International,
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
how to calculate water proofing area and what is the easy process. explain
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)