HOW we can calculate the quantity of sand and cement for 1:4
plastering with a thickness of 12 mm..total area need to be
plaster is 985 sqm
Answer Posted / mughal sab
brother in your answer plz clearly define this step
10598.6*0.5=5299.3cft
1/5*1440=288 kg\
and why cement quantity is equal to sand quantity.?
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how to calculate rate analysys of 1:6 plastering 10 sq m
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
Technical Question of Civil Engineering
Why the finite element method is lower bound solution?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What is the l/d ratio of cantilever beam?
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
how to caliculate required amount of cement and sand required for 1cu.m.
What glue is least sticky?
How and where are aqueducts built?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.