HOW we can calculate the quantity of sand and cement for 1:4
plastering with a thickness of 12 mm..total area need to be
plaster is 985 sqm
Answer Posted / eakub.molla
Total area=985m2
thickness of plaster=12mm=.012m
wet volume of plaster morter=985*.012=11.82m3
dry volume of morter=11.82*1.5=17.73m3
volume of cement=17.73/5=3.546m3
volume of sand=14.184m3
cement bag=3.54/.03542 bags
=100 bags.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
List out the types of roofs?
How to calculate laplength for 3 floors
Describe a time when you anticipated potential problems and developed Preventive measures
what is the relation between pitch of steel and depth of slab?
Why you are leaving present job?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
how do you calaculate the total steel quantity of an rcc building using thumb rule?
what isload waring calculation
What is the release of lien?
Draw the cross section of a boundary wall and label its part with detailing?
Slab quantity
If specific gravity of cement is less than 3.15 what is the cause?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is the Unit weight of coarse sand (F.M- 2.20) ?????
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.