HOW we can calculate the quantity of sand and cement for 1:4
plastering with a thickness of 12 mm..total area need to be
plaster is 985 sqm

Answer Posted / eakub.molla

Total area=985m2
thickness of plaster=12mm=.012m
wet volume of plaster morter=985*.012=11.82m3
dry volume of morter=11.82*1.5=17.73m3
volume of cement=17.73/5=3.546m3
volume of sand=14.184m3
cement bag=3.54/.03542 bags
=100 bags.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2044


1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.

7571


how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail

3492


Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

1614


Explain the different types of building contracts?

660






a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula

1219


How many square meter can mason layout chb per hour

1805


What is hybrid foundation?

685


What are your future hopes for this job?

1833


how much of the strength comes from post-production curing

1868


Tell me about triple point of water.

671


How to plan a project

1717


what is anchorage length,lap length and (dont remember the last one)

1733


how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?

1573


what will happen if one could not properly follow the spacing of slab reinforcement bar?

1570