how to calculate the quantaty of steel in footing please show
me detail procedure with the help of drawing

Answer Posted / mohammed abdul moid

Take footing F= 4 No's size 1.2m*1.2m. and 6No. of
16mmbars
take bottom bar 1.2m and depth 0.5m
Total length L= 1.2+0.5= 1.7mt*1000= 1700

Formula =[3.14*0.00000785*16/2*16/2*1700]*6(No of
bars)
=[3.14*0.00000785*8*8*1700]*6
=[2.6818]*6 = 16.09
=[16.09]*2(Top n Bottom bars)=32.08
=[32.08]*4(No of footings in plan)
=[128.72kgs]

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1646


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

2767


what is the difference between tsp & tower

1695


how much cement sand n bricks required in im3?and how much in plaster?

2097


if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column

1612






what is the meaning of degreasing of the euipment or line.

3305


Explain what is the difference between built area and super built up area?

681


For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38

1404


What is rolling stock

1881


WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?

1930


What is the use of array command?

685


Explain what is alternate bid?

779


In earth work 1300 cum soil how to calculate how many liters require in water

1996


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1593


how find the cut length of tringular ring and any formula find out the quantity of circular brick work

5671