how to calculate the quantaty of steel in footing please show
me detail procedure with the help of drawing
Answer Posted / mohammed abdul moid
Take footing F= 4 No's size 1.2m*1.2m. and 6No. of
16mmbars
take bottom bar 1.2m and depth 0.5m
Total length L= 1.2+0.5= 1.7mt*1000= 1700
Formula =[3.14*0.00000785*16/2*16/2*1700]*6(No of
bars)
=[3.14*0.00000785*8*8*1700]*6
=[2.6818]*6 = 16.09
=[16.09]*2(Top n Bottom bars)=32.08
=[32.08]*4(No of footings in plan)
=[128.72kgs]
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
what is total volume of ingredients used in concrete accordingly
what are the changes in concrete pour height as per IS 456, 2009?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
What ingredients with% found in ppc cement??
why we use aggregate,sand with cement in concrete?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
Doul Bar reinforcement and details of drawing.
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
What is the purpose of Chipping in the heavy foundation?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
Which IS Code/American Code applied for coupler test of steel
During reclamation how can the occurrence of mud waves can be rectified?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?