As per the Anchor capstan motor specification, full load
current is 200A. starting current is 1750 A and
acceleration time is less than 8 seconds. Please guide for
selection of cable size.
No Answer is Posted For this Question
Be the First to Post Answer
why we use single core 630mm2 cable for transformer secondary side
is the value of inductance depends upon the value of thitha in doubly excited machine??
how we can check the CT & VT?
What is the operating principle of turbo-generator.
Why electricity in India is in the multiples of 11 like 11kv, 22kv, 33kv
what is compatible kva for 3300 watts and why
Whether earthmat designning is done only for sub station or it can be done for multy residential complexes also? What is the size, type & arrangement of the earth grid to be done?
Why increase in current leads to increase in conductor temperature?
Technical equations
What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.
How will A Medium voltage circuit breaker(11 kV voltage level) operate under short circuit fault condition whether It is having short circuit release like Low voltage circuit breaker or relay should be given?
What is the main difference between power transformer and Distribution transformer?
9 Answers APTransco, Bhel, NTPC,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)