what is the lap length on column? state the farmula plz
with explaination.
Answer Posted / dhandeep desai
lap length for column 50d(formula & length )
or it is taken ld with dia. of bar
| Is This Answer Correct ? | 31 Yes | 3 No |
Post New Answer View All Answers
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
What is the per cu. mt. price of ready mix in Gujarat region.?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
400 ku d/c clearess ketan hota hai?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
water leak detection system question & answer
what is the difference between replacement of cement by groundnut shell ash
plz.show development and anchorage length in simple diagram.
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
pls mail some more tecnical qustions at msaranya2610@gmail.com
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?