how to calculate required shuttering material like
props,spans,plates ..etc for a slab?
Answer Posted / sahilshah.civil@gmail.com
Props 450 mm C/c
Span near beam 1 nos each & mid span spacing will be 600mm c/c
Plate start from beam end
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
what are the code used for residental building?
What do you mean by the word 'shear'?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
what is the theoritical percentage of concrete cubes testing per day?
Which code is used for tor & tmt steel bar?
Why should you show Client/Engineer activities clearly on the project plan?
What is geopolymer based concrete?
What are the advantages of building a dam on the river nile?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
How to design staircase.plz tell me formula for the design the staircase.
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
How will you Engage Labours on Site?
What is construction mitigation management?