trapozidal
No Answer is Posted For this Question
Be the First to Post Answer
calculate if the size of the beam is 300*500 then L for the top & bottom bar
how to prepare Steel schedule or Bar bending schedule.
how much steel is required foe following components.. footing- plinth beam- column- beam- slab-
What are the RISKS during the project construction?
What is the quantity of cement, sand, and gravel to be used in M20 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention it in CFT)
in 100 cft = 1350 bricks in 100 cft = ? bloks
what we execute firstly wall tile or floor tile?
7 Answers Colliers International,
15mm thick plastering 1:4 what is the cement consumption per sqm
in moon night and stars r shining with moon n u stand n lloking towards sky if u have no copass, and no any other civil lab equipment, then how u point out the North direction for serveying??
what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?
12 Answers HPCL, Shrestha Civil Engineering Construction Company Pvt. Ltd, Sri Avani Projects, Tata Projects,
Difference between pre-tensioning and post-tensioning.
What is the lapping length for 32mm steel rod as per BS standards?