what are some possible sources of error in the CBR test?
Answer / tsholofelo
Some possible sources of errors in the California Bearing
Ratio (CBR) test are worn test tools, trash in the test
area, recent rain, old stream bed, missing the standard
height during compaction, compacting slower or faster than
compaction rate, and hitting the mould against hard objects
in order to remove the contents after compaction can remove
it from calibration.
| Is This Answer Correct ? | 6 Yes | 11 No |
i m a btech 1st year student of civil branch. i want to do mba in future after having some work experience in civil field.is there any mba course made exclusively for civil engineers?
how to calculate slab reinforcement c/c spacing bars and how calculate minuam slab basic slab & roof beams reinforcement design
What is braced excavation all about?
Brick size ? & 1 square feet brick work for use brick
What are the skills required to become an architect?
what is the weight if 1m3 M25 concrete after setting?
why we always consider Bulkage due to the voids only for the Fine aggregates not for the Coarse aggregates
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
Column is a compression member then why we provide reinforcement on column?
1 Answers Simplex, Thermax, Vihaan Group,
Explain what is Critical Path Method (C.P.M)?
What is civgl engg?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)