Answer / pckundapur@gmail.com
For pole mounted SS ,minimum 3 earth electrodes are
required. Neutral, metal parts including body and L.A.
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / krajeshkumar1989
for every stucture,ct,cvt,la,isolator 2 eathing is madatory.
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / niki
In 25 kva s.s. only 1.1 MVA fault level so , we should use oonly 2 earthing pit. One for body grnd and neutral grng.
| Is This Answer Correct ? | 0 Yes | 0 No |
How can we calculate ngr resistance for a generator and Transformer ? What type of transformer requires ngr ?
Can a 5 core cable one end with a 32A 3p+N+E plug and the other end 32A 3p+E be used on a generator?
Define what is power quality meter ?
why 3 phase is converted into 2 phase using electronics circuit why not 2 phases are diresctly putted from the 3 phase transformer??
how to calculate 'In'in a system?
single phase for 230 then why three phase are 440 volt
why an ideal voltage source has low internal resistance????
generally in LT and MV motors we are using 3.5Coresx16,25,35,50 etc cable for supply.although motors is earthed at two point and having all protection.then why we are using that 1/2 core for earthing the motors.while in HT cable we are using only 3core cable for motor supply.generally lt and mv motors are delta connected and ht motors having star connection.whethere it is having any relation with winding connection( star or delta).all motors i am talking about are dol only.can anybody solve my confusion.thanks...
I need to connect a synchronous generator to the grid using automatic synchronization and two circuit breakers (one for synchronization, one for end connection to the grid), how to determinate the required diameter of the cables?
hi friends can u tell me name of the sites where i can get animation of electrical machines......
DEAR ALL I have motors ( 10 units )each one is 90kw 380V 50 HZ 1000rpm but new local pwer is 220v 60 hz requierd rpm should be 1000 pleas what the beast solution is used frequncy converter or rewinding all motos or chang all motors thanks
they conducted technica for 1 hour..i also managed..they selected 5 boys and only one girl,myself got wait listed.whether they would call or not
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)