what are the compressive strength requirements(in 7 days &
28 days) of cement sand mix used for plastering purpose
(Cement:sand-1:6)? Kindly give the IS Code reference also.
Answer Posted / nasir
70%
Is This Answer Correct ? | 5 Yes | 9 No |
Post New Answer View All Answers
How to find out slope footing concrete
Explain what is the difference between built area and super built up area?
What are the alternate material for steel, Sand and aggregate
The mixture of different ingredients of cement is burnt at?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
What is difference between limit state and working stress method? How it is applies in building structure.
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
which has high compressive strength between hollow block and brick masonry?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
How much quantity of rod binding work by a rod binder per day
how to calculate the concrete mix m30 by volume
What is hybrid foundation?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
Consumption of Binding wire for fixing of cover block in vertical surface