What is labour rate per kg for cutting,fixing and binding
of reinforcement steet..??
Answer Posted / manishyahoo
Labour rate is Rs.12/- per kg
| Is This Answer Correct ? | 9 Yes | 21 No |
Post New Answer View All Answers
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
What is diversion tunnel in a dam?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
why & what is perchatage we are using fly ash in concrete?
what are the changes in concrete pour height as per IS 456, 2009?
What is meaning of FREE STANDING STAIRCASE ?
How to calculate Volume of Wet cement concrete for a specific grade?
what are the values of compressieve strenght?
how lap length is increased with increase of Grade of steel?
please briefly explain calculating or estimating steel quantity for a RCC column?
what is constat for brickwork
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
How is the leaning tower of pisa supported?
use ofr concrete as per grade ?