At which place Construction joint should provide in slab
and Beam at the time of casting.
Answer Posted / manoj kumar bhola
L/3 OF THE SPAN
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
how to tie 10 legged stirrups
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
What is the standard volume of pharma in cub ft
Explain moment of inertia and its importance.
What is the absolute pressure scale?
Does brick grows bigger every year?
difference between trapezoidal and pedestal footing and how the load acts on that
how is the reinforcement is distributed in triangular slab