At which place Construction joint should provide in slab
and Beam at the time of casting.

Answer Posted / manoj kumar bhola

L/3 OF THE SPAN

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define Workability ?

784


Who name us Engineer & Why?

2025


Tell me about triple point of water.

671


Difference between lime, distemper and plastic emulsion?

1229


IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,

1811






What is thumb rule in quality and quantity estimation of a Residential building??

1210


How do we calculate absolute pressure?

766


how u design STAGING for Superstructure in BRIDGE construction?

1892


How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

943


1m square 20mm plastering how much of water need curing work

1457


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

2597


how to calculate steel for slab or footings?

1183


why we can use dust in concrete insted of fly ash

1695


what is conrete grade ,how are depent on concrete grad and size of concrete?

2042


how much percent are used 20mm,10mm?

1437