At which place Construction joint should provide in slab
and Beam at the time of casting.
Answer Posted / alp
L/4 for Slabs and Beams
L/3 for Columns
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is the clear cover for shearwall?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
What is construction mitigation management?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
what is the type of earthing
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
how many tonnes equals to one cubic feet?
How can we convert weight batch to volume batch for m30 mix
how clculate excavated or backfilling quantity by simpson's rule
The 4 main factors to start a construction project are––
What are the composition of a landfill?
how do we design mix ratio?
Define What glue is least sticky?
how u design STAGING for Superstructure in BRIDGE construction?
What is bmc stands for in bmc software?