In a large office how do we calculate required number of
light fittings, assuming fittings are 4x18W or 2x36W
fluorescent fitting ?
No Answer is Posted For this Question
Be the First to Post Answer
I need the proper answer on :- What is the Earthing Value as per the standard for Raw power and UPS Pit and in panel /DB N-E value ???
i have applied for junior engineer 2 c&w for Guwahati RRB please send me last five year question paper
The power factor of the fixed load is 0.8, now the p.f is varying from 0.8 to 0.5.
What are the different types of transformers present in the Transmission and Distribution system?
why stator winding of synchronous machine are connected in star connection ?
What are the disadvantges of leading power factor
Why IGBT is very popular nowadays?
what are the safety of chiller.
how to calculate current in HT side when we having LT current
how many types of accuracy class in ct? what is meaning of 5p20?
what is the dedicated earthing
What's is the difference between IVT and CVT?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)