what is the criteria for the finalisation of pavement
thickness in road project?
Answer / er gulzar ahmad
To Finalize the pavement thickness in road projects,it is
mandatory to know the CBR value of the subgade and traffic
data
| Is This Answer Correct ? | 0 Yes | 0 No |
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
37.18kg/qu.cm.Compressive Strength and 10.20% Water Absorption weight,Efflorescence-nil this result use in construction work
what is anchor bar??
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
what does gabion mattress means in stone pitching works
Explain what are the problems one might face while having a Cantilever balcony?
Thumb rules for 1.brickwork & Blockwork 2.Plastering 3.FLooring and tiles 4.Shuttering 5.Steel
HOw many cement bags are required for M35, M40 & M45 grade of concrete?
What is reinforced concrete?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
How can i display 5 asterisk and another 5 asterisk )?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)