what is the criteria for the finalisation of pavement
thickness in road project?
Answer / er gulzar ahmad
To Finalize the pavement thickness in road projects,it is
mandatory to know the CBR value of the subgade and traffic
data
| Is This Answer Correct ? | 0 Yes | 0 No |
how to estimate shuttering form work or how to take off material quantity???
how much cement sand n bricks required in im3?and how much in plaster?
for concrete cubes samples.. what if the 7 days gain the strength of 42.34 mm/2 and the 28 days only gain the strength of 37.5 mm/2?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
What is the amount on nails per bag needed for 1m square of wooden form work?
2 Answers Ansal Housing, College School Exams Tests,
how much quantity are required like cement,sand,aggregate for (46*29*0.41)feet slab? how much this quantity can be calculated?
which type of foundation are most prefarable in blockcotton soils
why only water cement ratio always......why not water sand ratio while making concrete
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
What is meant by solid geometry?
What are the types of Road in India?
polavaram project is situated inwhich place?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)